Factory capacity
Throughput result
Time to clear all input0 mo0% planning utilization
- Monthly input capacity
- 0 L
- Processed input
- 0 L
- Finished output
- 0 L
- Input remaining
- 0 L
- Cycles required
- 0
- Output sale value
- $0
Use the current recipe screen
Cycles and liters per cycle can change with factories, maps and mods. Save the recipe shown by your current production point.
Bottleneck control
Do not overbuild the input side
Time-to-clear shows whether a factory can process the stock already in storage. Add parallel factories only when input supply and output handling can keep them active.
Planning utilization compares processed input with the total capacity available in the selected months. A full result with remaining stock means the production stage is the bottleneck.